To Main | Ðóñ | Eng
Send link by EMailSend link by EMail PrintPrint FeedbackFeedback HelpHelp
Pure energy for future generations
EMAlliance
Press
Press releases
Industry news
Management speaks
Calendar of events
Image library
Contest
Useful links

Press release

“EMAlliance” develops the cooperation with Ukrainian partners

22.04.2010

JSC “EMAlliance” has won a tender of JSC “Donbassenergo” (Ukrain) within the Project of Starobashevskaya TPP Power Unit ¹11 modernization. The leading international powermachine building companies took part in the tender.

Within the cooperation with JSC “Donbassenergo” JSC “EMAlliance” will work out the design of the boiler furnace bottom part replacement for the gas-tight one.

Pursuant the developed project the furnace chamber components and boiler redesigned burners TP-100 for Starobashevskaya TPP Power Unit ¹11 will be delivered to the Customer. The Work Price under the Project is 40 million rubles.

In the current year this is the second project of JSC “EMAlliance” related to the modernization of the Ukraine energy system facilities. It should be remembered that in January JSC “EMAlliance” signed the Contract with the Ukrainian company “Zakhidenergo” for supply of boiler auxiliary equipment within Burshtynskaya TPP Power Unit ¹ 7 reconstruction project with the total price 150 mln.rbl.

Commenting the tender results President of JSC “EMAlliance” Timur Avdeenko underlined, that Ukraine market was the strategic one for the company.

“Òhe references which we can demonstrate to our Ukrainian partners within the execution of these contracts will become a serious basis for further involvement of the company in the modernization of the Ukrainian energy system on a new technological level. We will manage to offer to the market the full range of capabilities EMAlliance possesses for today” – he said.

Reference:

JSC “Energomashinostroitelny Alliance” (EMalliance) is one of the leaders of domestic power machine-building industry, having international experience and competence in designing, fabrication and complete supply of “boiler islands” for TPP, including EPC-contracts. “EMAlliance” possesses more than 70,83% of common shares of Plant “Krasny Kotelschik”. EMA’s engineering branches are located in Taganrog, Podolsk, Barnaul and Ivanovo. Enterprise personnel is 6000 employees, among them 700 highly qualified designers. The present day the company is able to design boilers with steam generation from 100 to 4000 tones per hour, (inc. for the equipment with to-, above-, ultra supercritical steam conditions. EMAlliance possesses the technology of designing and fabrication of HRSG for CCP and performs engineering, complete supply of the equipment for WtE plants and bio fuel processing enterprises and develops new technologies in renewable energy sources, pollution abatement system, coal gasification, SCC.

back

Press-center

Last updates

23 june 2010 ã | 11:00
26 october 2009 ã | 00:00
zip EMAlliance
ZIP, 4Kb